anyone have any plans in the off season this winter ( for those who have an off season) my plans are install a low gear set in my c4 send my headers out to be recoated new landrum front coil springs flex-form fiberglass leaf springs hopefully i make enough overtime to cover the money needed to fund the project before april Duane
Just put together another order for summit racing on cylinder heads . !974 Comet goes in for brake hoses an wheel cylinders with a new inspection sticker. Summer time here we come. That is after a new paint job.
Get all my trim and chrome ready to go back on in the spring. Hood trim, boomerangs, tail lights, front bumper done. Need to do window trim and send out the back bumper.
I've got a long list, but at least it's small stuff; I am replacing the axle seals on the 9", decided to run tubes in the slicks, so breaking down the tires and wheels and drill for screws, replace the special SEC copper headers gaskets with thick ones, replace the trans to cooler lines, and just sent the Mallory 250 fuel pump to be refurbished...........................set the front end to 5 degress positive caster, 1/2 degree negative camber and 1/8" toe in.............hope it works in a straight line. Starting another project for this http://www.24hoursoflemons.com/
Finding a New intake, cam, 4:11 gears....or.. 4:56. And cal-tracs Also tons of bodywork and new paint.. And if I have enough time I'll maybe try and make a set of headers.. I think I'll throw a set of springs into the front of the car as well.. Not sure how I'll be dealing with the power steering I have either, the parts car I got has another non leaking unit... Tons more on the list but those are what have to be done first
going to put a deposite on a turbo 350 with everything i need to put it behind my 347 ultrabell,converter,flexplate and then cars getting a new driveshaft and new axels this winter so i can leave off the brake and bottle next year