[ATTACH] [ATTACH] [ATTACH] [ATTACH] Paid a visit to the fabricators shop to check roll bar and intercooler progress.
A little intercooler and radiator mounting [ATTACH]
I asked the caltrac folks about this because I was debating relocating the shocks. They said Ford originally installed staggered shocks to...
[ATTACH] [ATTACH] [ATTACH]]Installed engine and Procharger to send out for radiator and intercooler fabrication.
4.6 by Howard Forbes posted Jun 27, 2015 at 5:06 PM Mocking up the mill by Howard Forbes posted Jun 27, 2015 at 5:02 PM Mocked up the engine....
Shot Grabber Blue under the cowl and glued it down .[ATTACH]
Built the 8.8 rear end. Installed Ford racing carbon fiber clutches, 4.10 gears, all new bearings and 31 spline Moser axles. Should be enough...
Separate names with a comma.